J. KIMS Technol Search

CLOSE


J. KIMS Technol > Volume 14(5); 2011 > Article
Journal of the Korea Institute of Military Science and Technology 2011;14(5):850-858.
DOI: https://doi.org/10.9766/KIMST.2011.14.5.850   
A Study on Cost Risk Estimation applying Joint Cost-Schedule Probability Distribution Model
Dong-Kyu Kim, Sung-Jin Kang, Gyu-Sik Han
Korea National Defense University
비용과 일정의 결합확률 분포를 적용한 위험비용추정에 관한 연구
김동규, 강성진, 한규식
국방대학교
Abstract
The risk analysis plays an important role in weapon system acquisition project due to uncertainties in the acquisition process. But in domestic, studies on risk analysis are insufficient and risk cost is not included in acquisition budget in policy. Therefore, in this study, we suggest a method that measures risk or success probability of project using the stochastic model. In particular, in order to calculate the success probability, we apply the joint probability distribution model of cost and schedule that are critical factors influencing the project risk. And also we verify the applicability of this model in Korean defence industry environment through case studies.
Key Words: Joint Cost-Schedule Probability Distribution, Cost Risk, Success Probability, Risk Analysis
TOOLS
Share :
Facebook Twitter Linked In Google+ Line it
METRICS Graph View
  • 0 Crossref
  •    
  • 465 View
  • 0 Download
Related articles in J. KIMS Technol.

A Study on Configuration Design of the 2D Course Correction Munition2008 August;11(4)



ABOUT
ARTICLE CATEGORY

Browse all articles >

BROWSE ARTICLES
FOR CONTRIBUTORS
Editorial Office
160 Bugyuseong-daero 488beon-gil, Yuseong-gu, Daejeon 34060, Korea
Tel: +82-42-823-4603    Fax: +82-42-823-4605    E-mail: kimst@kimst.or.kr                

Copyright © 2024 by The Korea Institute of Military Science and Technology.

Developed in M2PI

Close layer
prev next