[1] Byung-ho Kim et al, PM+P Manual(PMBOK guide 7th Manual), sodong, Republic of Korea. pp. 430–431, 2022.
[2] Dong-hwan Han, "PMP® PASS, 4th," pminside, Republic of Korea. pp. 7342019.
[3] Sung-chul Park et al, "PMI-RMP: PMI Risk Management Professional," BM, Republic of Korea, p. 12–13, 2016.
[4] Il-Sang Yoo et al, "Risk Management Process Based on Systems Engineering," Society of Korea Industrial and Systems Engineering 2004 Symposium, pp. 9–12, 2004.
[5] Il-Sang Yoo et al, "Development of Risk Management Process for KSLV-I Program," Journal of the Society of Korea Industrial and Systems Engineering, Vol. 29, No. 1, pp. 94–100, March;2004.
[6] Dong Hyun Cho et al, "A process of the Risk Management for a Space Launch Vehicle R&D Project," Journal of KOSSE, Vol. 12, No. 2, pp. 19–27, 2016.
[7] Sung-Ryong Do et al, "Implementing Software Risk Management process based on CMMI," Journal of the Convergence for Information Technology, Vol. 1, No. 1, pp. 45–53, 2011.
[8] Jongmo Park et al, "A Case Study for Process Improvement of a Small-Scale Project Risk Management," 2011 Korea Computer Congress, Vol. 38, No. 1B, pp. 94–97, 2011.
[9] Jang Jonggi, "A Study on Risk Management Process Improvement for IT Prohect Based on CMMI," Korea University, 2011.
[10] Lee Jeong yeol, "A Study on Appraisal Method for Weapon Systems Acquisition Business Based on CMMI," Journal of the Military Operations Research Society of Korea, Vol. 41, No. 1, pp. 49–64, 2015.
[11] DAPA. "SE-based Risk Management Guidebook," Gyeongseong Munhwasa, Republic of Korea, 2018.
[12] ADD. System development stage risk management guidebook, 2018.
[13] TSO. "Managing Successful Projects with PRINCE2," 6th Ed.(2017 Ed.). AXELOS, 2017.
[14] PMI. "A Guide to the Project Management Body of Knowledge," "PMBOK Guide," 6th Ed.Project Management Institute, 2017.
[15] ISO/IEC/IEEE15288:2015(E). Systems and Software Engineering-System Life Cycle Processes, 1st Ed.pp. 46–47, 2015.
[16] ISACA. "CMMI Model V2.0-Practice Areas," ISACA, p. 425–426, 2018.
[17] Taeheum. Na et al, "The Architecture Model of Test Process for Defense Systems," KIMST Annual Conference Proceedings, pp. 1214–1215, June, 2023.
[18] Oscar A. Mondragon et al, "INCOSE SE Handbook V4 to CMMI V2.0 Development Mapping," The 29th Annual INCOSE International Symposium, 2019.
[19] Oh Sejin et al, "A Development of the Project Management System 2.0," ADDR-412-230221, pp. 14–15, 2023.