[1]. "Weapons System RAM Guideline," Gwacjheon-si, Gyeonggi-do, South Korea, Defense Acquisition Program Administration, 2021.
[2]. "Action Officer Guide for the Development of the Operational Mode Summary/Mission Profile(OMS/MP) Working Draft," TRADOC Army Capabilities Integration Center (ARCIC), U.S. Army, 2012.
[3]. J. G. McLeish, "Overview of New DoD Reliability Revitalization Initiatives," DfR Solutions, College Park MD, 2009.
[4]. C. H. Han, K. Y. Shin, and M. H. Oh, "Establishing Target RAM Values of Small Tactical Vehicles based on OMS/MP and the Repair Record Analysis of Similar Equipments," Korean Journal of Military Art and Science, Vol. 71(1):pp. 149–170, 2015.
[5]. J. M. Hu, H. Z. Huang, Y. F. Li, and H. Y. Gao, "Bayesian Prior Information Fusion for Power Law Process via Evidence Theory," Communications in Statistics-Theory and Methods, pp. 1–19, 2020.
[6]. Y. J. Wang, Y. J. Kim, and B. K. Lee, "A Study on Effective RAM Target Value Setting Methodology for Naval Warship," Joint Academic Conference, Institute of Control, Robotics and Systems, pp. 259–264, 2012.
[7]. K. H. Lee, S. H. Lim, and K. W. Oh, "A Scheme for Establishing the OMS/MP based RAM Goal Value," Korea Association of Defense Industry Studies, Vol. 23(2):pp. 1–24, 2016.
[8]. K. H. Hwang, and J. W. Hur, "A Study on the Improvement of RAM Objective Considering Method for Weapon System," Journal of Applied Reliability, Vol. 17(2):pp. 150–158, 2017.
[9]. H. S. Park, T. W. Kwon, C. H. Lee, and D. H. Park, "A Proposal on Analyzing Operational Mission Summary/Mission Profile and RAM Goal Setting from Operational Concepts on the Next-MILSAT- COM," Journal of the Korea Institute of Military Science and Technology, Vol. 16(3):pp. 295–303, 2013.
[10]. I. S. Chung, K. W. Lee, and J. W. Kim, "Study on Setting Up the Quantitative RAM Goals for Rolling Stocks," Journal of the Korean Society for Railway, Vol. 11(4):pp. 390–397, 2008.
[11]. S. H. Baek, K. Y. Kim, Y. S. Lee, S. J. Moon, and J. S. Jung, A Study on Method of Deciding Ship RAM Objectives in System Demanding Phase, Defense Agency for Technology and Quality, Jinju-si, South Korea, DTaQ-09-1865-R. 2009.
[12]. S. H. Baek, S. H. Lim, I. Y. Na, and Y. S. Lee, HTARS RAM Analysis Report, Defense Agency for Technology and Quality, Jinju-si, South Korea, DTaQ-11-2974-R. 2011.
[13]. I. S. Kim, and W. Jung, "Comparative Analysis of RAM Value Correction Method based on the Evaluation of the Weapon System Staff," Journal of Applied Reliability, Vol. 19(4):pp. 374–381, 2019.
[14]. S. J. Han, and S. H. Paik, "RAM Goal-Setting Using the AHP and Field Data of Similar Weapon Systems," Journal of Applied Reliability, Vol. 20(2):pp. 154–162, 2020.
[15]. K. Y. Kim, and S. J. Bae, "Establishing Method of RAM Objective Considering Combat Readiness and Field Data of Similarity Equipment," Journal of the Society of Korea Industrial and Systems Engineering, Vol. 32(3):pp. 127–134, 2009.
[16]. S. B. Kim, W. J. Park, J. W. You, and J. K. Lee, "An Improved Method of Settting the RAM Goals for Surveillance System A Using OMS/MP and Field Operations Data of Similar Systems," Journal of KOSSE, Vol. 15(1):pp. 16–24, 2019.
[17]. J. H. Cha, I. S. Chung, J. W. Kim, and Y. H. Yu, "The Study on Setting Up KTX-II's RAM Goals for Requirement Train-Set," Proceedings of the KSR Conference, The Korean Society for Railway, pp. 191–198, 2009.