[1] I. Chung, H. Lee and Y. Park, "Reliability Evaluation of Weapon System using Field Data: Focusing on Case Study of K-series Weapon System," Journal of the Korean society for Quality Management, Vol. 40, No. 3, pp. 278–285, 2012.
[2] I. Jo, S. Lee and J. Park, "A Study on Reliability Growth through Failure Analysis by Operational Data of Avionc Equipments," Society of Korea Industrial and Systems Engineering, Vol. 36, No. 4, pp. 100–108, 2013.
[3] D. Kim and S. Kim, "A Study on the Test and Evaluation of the Guided Missile Based on Reliability Growth," Korea Association of Defense Industry Studies, Vol. 21, No. 3, pp. 114–133, 2014.
[4] C. Lee, Y. Ku, H. Hong, I. Jung, D. Park and S. Kim, "A Study on Reliability Program of the Armed Vehicles," Journal of the Korean society for Quality Management, Vol. 44, No. 3, pp. 565–574, 2016.
[5] Y. Lee, J. Ryu, K. Son, S. Song, S. Kim and W. Park, "A Study on the Reliability Growth of Multiple Launch Rocket System Using Accelerated Life Testing," Journal of the Korea Institute of Military Science and Technology, Vol. 22, No. 2, pp. 241–248, 2019.
[6] I. Moir and A. G. Seabridge, "Military Avionics Systems," John Wiley & Sons Inc, West Sussex, England, 2006.
[7] J. Park and J. Ma, "The Impact of P-3 Essential Assemblies on Operational Availability," Journal of the Korea Institute of Military Science and Technology, Vol. 22, No. 3, pp. 416–424, 2019.
[8] J. T. Duane, "Learning Curve Approach to Reliability Monitoring," IEEE Transactions on Aerospace, Vol. 2, No. 2, pp. 563–566, 1964.
[9] Ministery of Defence(UK). "Chapter 8: Reliability Growth Models. In Applied R&M Manual for Defence Systems(GR-77), Part D – Supporting Theory," UK Ministery of Defense, Abbey Wood, Bristol, 2011.
[10] W. D. Kelton, R. P. Sadowski and N. B. Zupick, "Simulation with Arena, 6th Edition," McGraw Hill, New York, 2015.